MK3 plates review

CONNECTORPLATE

Question from Bresto, 11/28/18

  • are the 3 round holes correct?
  • updated the D-shapes

Answer to Bresto:

  • yes for the 3 holes at 16 mm
  • checked size of N-type pass-thru, OK
  • component dimensions: SMA-N 12.75x15.75, Arrestor N-N 13.5x15.75
  • confirmed hole 13.7x16.1

21 Feb 2019: confirmed ready for production, quantity 50

DTACQSHELL

  • produced 50, excess with D-Tacq, no further order

PABASEPLATE

PA_Heatplate_6mm

  • use extruded plate as opposed to laser cut
  • so possibly not Bresto but SiamMeca or emachine shop
  • reduce length of 2 inner heat pipes and shift down (1/3 above 2/3 below)
  • reduce length of outer heat pipe and shift to align with center heat pipe

WAIT!

SIDECHANNELLEFT

  • shift upper and lower fan by 3/8" or 10 mm inward
  • remove 3 upper PEMS

21 Feb 2019: confirmed ready for production, quantity 25

TOPSECTIONU

  • criticism: standoff too rigidly placed
  • no need for this complication on the PA side
  • option: separate design for PA and recover existing RX U
  • need to acomodate NUC, VSWR-PROT,

WAIT!

TOROIDPLATE

  • unchanged

21 Feb 2019: confirmed ready for production, quantity 25

VENTCLOSE

  • no more, try to cut hole in existing ones

Vicor_HeatPlate_6mm

  • use extruded plate as opposed to laser cut
  • so possibly not Bresto but SiamMeca or emachine shop
  • reduce length of heat pipe and shift up
  • reposition heat pipe to center VICOR
  • remove upper VICOR drilling
  • reduce VICOR holes to 6 each.

WAIT!

WALLMOUNTS

  • 100 firm order 1842 EUR on 11/5/18 deliver 12/718 unchanged
  • 20 Feb. confirmed ready for pickup

RAILDINL323

  • unchanged

21 Feb 2019: confirmed ready for production, quantity 25

RAILDINL500

  • unchanged

21 Feb 2019: confirmed ready for production, quantity 25

RXBaseP1, RXBaseP2

Summary of modifications requested 11/15

  • shape of RX cards opening corrected for shorts (notch)
  • modifications of the position of the central plate scews
  • all holes tapped
  • order 20

Answer from Bresto on 11/27 asking confirmation

  • confirm shift 2 PEMS in lower plates and 1 PEM in upper plate
  • confirm notches (4)
  • confirm tap 36 holes

Review, missing:

  • upper omega holes to short, need to extend downward
  • update to 25 sets order (since excess receivers from Mexico)
  • 20 Feb: gave corrected drawing from UH, need to add PEMS

21 Feb 2019: confirmed ready for production, quantity 25

RXSHIELD

  • future

HEATSINKFANU

  • future

EQUERREBIS

WAIT!